Technical resource

PCB assembly RFQ file checklist

Prepare one consistent package so engineering and sourcing can quote the same build. Mark unknowns clearly instead of leaving different teams to make different assumptions.

Practical checklist

Agree the inputs, responsibilities and acceptance

TopicPrepare or defineCheck before release
Contact and projectCompany, contact, product use and project stageWho can answer technical and commercial questions
Board dataGerber/ODB++, placement data and assembly drawingReleased revision and any panel requirements
BOMManufacturer part numbers, quantities and approved alternativesTurnkey, consigned or mixed sourcing responsibilities
QuantitiesPrototype lot, planned order sizes and forecastWhat is firm and what is a planning estimate
Test and programmingFirmware, fixtures, test procedure and acceptanceWho supplies tools, software and validation
DeliveryTarget timing, destination, pack-out and special requirementsDependencies and requested delivery conditions

Worked example

Turn the checklist into an engineering decision

Example: include separate quantity lines for the pilot and repeat orders. Keep tooling, fixtures, materials and assembly assumptions visible so later quotations remain comparable.

Action log

Close the gaps before production

  • List the missing file or unresolved decision
  • Assign a customer or supplier owner
  • Record the proposed action and approval needed
  • Identify the affected revision and target build
  • Carry open items into the pilot release decision

Sources and use

A practical guide for project preparation

Editorial guidance from Keep Best EMS, organized around the manufacturing and engineering workflow described in the company profile. The worked example is illustrative, not a customer performance claim. Updated 28 September 2026.

Use this checklist with your product drawings, component data and agreed acceptance requirements. The final manufacturing and test plan is specific to the released product.

Engineering requirements

Include the bare-board manufacturing definition

Where bare-PCB procurement is included, provide the controlled fabrication drawing and stack-up with laminate requirements, layer structure, copper requirements, finished thickness and tolerances, surface finish and hole details. Include controlled-impedance requirements and their verification method where applicable. These requirements may be supplied in referenced drawings rather than duplicated in the enquiry.

Keep fabrication data, BOM, placement data and assembly drawings at the same approved revision. Identify applicable workmanship and acceptance requirements, including the standard revision and class where specified; mark unresolved requirements for review before the build is released.

Start a conversation

Prepare your project enquiry

Tell us what you need to build or the question you would like to discuss. Our team will help define the next step.

NDA available before you share confidential files.

We can sign a non-disclosure agreement before discussing sensitive designs. Your project information and files are handled confidentially.

sales@keepbestems.com
+86 189 2521 9610

Keep Best – Simple Project Enquiry