7/1/2026
High Reliability PCB for Aerospace: Requirements, Risks, and Supplier Checklist
A procurement guide to aerospace high-reliability PCB and PCBA projects, covering mission requirements, material and stackup control, workmanship, inspection, test evidence, traceability, and supplier qualification questions.
6/21/2026
Medical PCB Assembly: RFQ Checklist for Medical Device Electronics Buyers
A focused RFQ checklist for medical PCB assembly buyers covering file readiness, BOM risk, DFM, quality records, test fixtures, traceability and release documentation.
6/2/2026
Functional Test Fixture Readiness: The PCBA Gate Many Teams Plan Too Late
A functional test fixture is not just a tool for the factory floor. It is a product launch gate that must be planned with firmware, limits and failure analysis in mind.
5/31/2026
DFT for PCBA: How ICT and FCT Should Work Together
A deep DFT guide for PCBA buyers, explaining ICT/FCT coverage, test point access, fixture planning, firmware control, failure localization and production evidence.