Tag Collection

PCBA guide

10 related articles.

10 articles
5/31/2026

DFM File Checklist Before Submitting a PCBA RFQ

Preparing Gerber, BOM, centroid, test requirements and special process notes before RFQ reduces back-and-forth communication and quotation assumptions.

5/31/2026

What Validation Should a BOM Alternate Approval Flow Include

BOM alternate approval cannot rely only on package and price; electrical, thermal, software, test and customer-controlled requirements must be validated.

5/31/2026

SMT Process Window Basics: From SPI to Reflow Profile

An SMT process window should be judged by solder paste, stencil, placement, reflow, AOI and X-ray data, not final yield alone.

5/31/2026

How to Judge Whether ICT/FCT Test Coverage Is Enough

ICT and FCT cover different failure modes; buyers and engineers should review the test matrix instead of only asking whether testing is 100 percent.

5/31/2026

Which Fields Should a MES Traceability Report Include

A useful MES traceability report should connect serial number, material lot, process parameters, test results, repair records and shipment lot.

5/30/2026

How to Write BGA X-ray Inspection Criteria into PCBA Requirements

For BGA, QFN and LGA hidden-joint components, PCBA requirements should define X-ray scope, criteria, sampling level and reinspection rules early.

5/30/2026

Conformal Coating Process Control Is More Than Material Selection

Conformal coating reliability depends on cleanliness, masking, thickness, curing, visual inspection and rework rules, not only material brand.

5/30/2026

PCBA Pilot Run Acceptance Checklist: When Is Production Ready

Pilot acceptance should review DFM closure, BOM risk, SMT process, test coverage, defect trend and delivery data, not only whether samples power on.

5/30/2026

15 Engineering Questions to Ask When Evaluating a PCBA Supplier

When evaluating a PCBA supplier, questions should cover DFM, BOM, SMT, testing, traceability, issue closure and delivery communication, not quotation only.

5/30/2026

PCBA RFQ File Preparation Guide: BOM, Gerber and Test Specification

A clear RFQ package should include BOM, Gerber, centroid, schematic, test specification, annual volume, delivery target and special process notes.